Skip to content

Hotel and hospitality painting · Palm Beach County

Hotel and hospitality painting in Palm Beach County

Palm Beach County's hospitality calendar peaks in winter, when the island resorts, the Boca Raton hotels and the clubs are full. Many owners plan big exterior repaints for the quieter months, which are also the rainiest. The schedule has to work around both.

A tall cream and orange hotel with rows of balconies, seen from below between palm trees.

Inside, the work is room by room and floor by floor, with the hotel taking rooms out of inventory only as needed. Corridors, ballrooms and lobbies are often done overnight, and every area is cleaned and handed back before guests return.

Outside, coastal hotels deal with salt on railings, pool fences and metal trim, and their facades are often in the guests' photos. Color matching and approvals matter, especially where a town board reviews exterior colors, as on the island of Palm Beach.

Guests come first on site. Work zones are screened, noise is held to agreed hours, and equipment is kept away from the pool, entrances and event lawns. Tell us the occupancy plan and the events calendar, and we will phase around them.

Sequence

  1. Tour the hotel with its general manager and chief engineer.
  2. Set the phases around occupancy, events and the season.
  3. Screen and protect work zones, entrances and pool areas.
  4. Prep and repair surfaces block by block.
  5. Apply finish coats and return each block to service.
  6. Inspect finished areas with hotel management and clear open items.

Common failures

Where these jobs slip, and what we do about it

An event the same day

A wedding on the lawn cannot share space with a lift. The events calendar is part of the schedule, and the site is cleared for each event.

Rooms out of service too long

Each room out of inventory costs the hotel. We work in blocks agreed with the front office and return them on schedule.

Smell in the corridor

Guests notice paint smell. Low-odor products, ventilation and overnight work keep it from reaching occupied rooms.

Outside this scope

Furniture, fixtures and room equipment are moved by the hotel unless written into the scope. Historic or landmark properties follow the town's review process.

Questions

About hotel and hospitality painting

Can you paint while the hotel is open?

Yes. Work is phased by room block, corridor or elevation, with guest areas screened and noisy work kept to agreed hours.

When is the best time to repaint a hotel exterior here?

Many properties choose the off-season for occupancy, but it brings more rain. We weigh both with you and plan around the forecast.

What does it cost to paint a commercial building?

There is no rate sheet. The quote comes from a visit, or from photos and drawings when they show enough, and it turns on the condition of each surface, the repairs found after washing, the coating system, how every wall is reached, who stays inside and which approvals come first. Two Palm Beach County buildings of the same size can need very different work.

Is any job too small or too large in size?

No. Romco quotes a single storefront, a lobby or a stair tower, and it quotes the whole envelope of an oceanfront condo or a row of warehouse bays. Describe the building and the surfaces, and the scope is written to match.

Is Romco licensed to do this work?

Romco Builders is a licensed Florida general contractor with its office in Fort Lauderdale. Florida law does not let a city or county require a separate license for painting. Ask for the license details with your quote.

How a job runs

The order of work, start to turnover

  1. Tell us about the building

    Phone us or use the form. Say what needs painting, who will be inside, and send photos or drawings if you have them.

  2. Site visit

    We check each surface, how the walls and rails can be reached, and what below them needs protection.

  3. Scope and written quote

    You get the prep, coating system, access method and phasing in writing, plus the approvals the work depends on.

  4. Approvals cleared

    Board or color sign-off, any permit the related repairs need, and badges or gate access are lined up first.

  5. Prep, prime and finish

    Washing, repairs, primer and finish coats go on in the agreed order, with people and cars below kept clear of overhead work.

  6. Walk-through and closeout

    Together we inspect the finished surfaces, clear the open items and leave you a written list of every coating applied.

Hotel and hospitality painting throughout Palm Beach, including West Palm Beach, Boca Raton, Palm Beach (the Town), Jupiter, Delray Beach, Boynton Beach, Palm Beach Gardens, Wellington, Lake Worth Beach, Unincorporated Palm Beach County, and every other Palm Beach city.

More painting work

Other buildings we quote

Palm Beach County commercial painting, any building

Tell us what needs paint, and Romco will scope it and send a quote.

Romco Builders is a licensed Florida general contractor, headquartered in Fort Lauderdale. A single storefront or a forty-unit building: each job gets a written scope.

Call (561) 273-9189Request a quote